Research Article
Discrete Element Simulation and Monitoring Analysis of Different Construction Methods of the Shallow Buried Bias Tunnel
Figure 2
Longitudinal profile diagram of the Qijiazhuang tunnel: (a) longitudinal profile diagram of left line; (b) longitudinal profile diagram of right line.
| (a) |
| (b) |