Research Article

Discrete Element Simulation and Monitoring Analysis of Different Construction Methods of the Shallow Buried Bias Tunnel

Figure 7

Distribution of contact forces for final excavation stage of the single side heading method: (a) work condition 3: the single side heading method without systematic bolt; (b) work condition 4: the single side heading method with systematic bolt.
(a)
(b)