Research Article
Discrete Element Simulation and Monitoring Analysis of Different Construction Methods of the Shallow Buried Bias Tunnel
Table 1
Scheme of numerical simulation for different excavations and reinforcements.
| Work condition | Excavation method | Support method |
| 1 | Three-step method | Initial support (without systematic bolt) | 2 | Three-step method | Initial support (with systematic bolt) | 3 | Single side heading method | Initial support (without systematic bolt) | 4 | Single side heading method | Initial support (with systematic bolt) |
|
|