Research Article
Shaking Table Test of a Full-Scale RC Frame Structure with an Indoor Gas Piping System
Figure 6
Model construction: (a) RC frame concreting, (b) steel wing ring, (c) GS pipe threading, (d) TSS pipe argon arc welding, (e) PE pipe hot melting, (f) pipe strap, (g) indoor gas pipes, and (h) model completion.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |