Research Article
Life Cycle Cost Analysis of Ashore Marine Engine Room
Table 9
Changes in the present value of Option 2 (million RMB).
| Uncertainty factor | Rate of change | Value of cost change | Present LCC value | Value of LCC change | Rate of change | Sensitivity factor |
| Basic | 0.00 | | 38294.73 | | | | Acquisition cost | 0.20 | 6042.96 | 39301.89 | 1007.16 | 0.04 | 0.18 | −0.20 | 4028.64 | 37287.57 | −1007.16 | −0.04 | 0.18 | Installation cost | 0.20 | 1221.48 | 38471.84 | 177.11 | 0.01 | 0.03 | −0.20 | 814.32 | 38117.61 | −177.12 | −0.01 | 0.03 | Operating cost | 0.20 | 2064.76 | 44124.22 | 5829.49 | 0.21 | 1.04 | −0.20 | 1376.50 | 32465.23 | -5829.50 | −0.21 | 1.04 |
|
|