Research Article
Study on the Mix of Slurry Membrane for Soil Conditioning of EPB Shield and Its Application Effect in Water-Rich Gravel Strata
Figure 18
The transverse surface settlement of the tunnel. (a) Transverse surface settlement of tunnel without a slurry membrane (unit: m). (b) Transverse surface settlement of tunnel with a slurry membrane (unit: m).
| (a) |
| (b) |