Advances in Civil Engineering / 2022 / Article / Tab 1 / Research Article
Numerical Analysis of the Mechanical Responses and Transition Section Design of Pavement Structures in the Entrance and Exit Sections of Highway Tunnel Table 1 Distress investigation results of Yangkou tunnel.
Detection lane Stake number International roughness index (IRI) (m/km) 2008 2009 2011 2012 2013 Left (up) K62 + 000 1.51 1.63 0.99 1.02 1.13 K61 + 000 1.43 0.99 0.66 0.87 1.03 K60 + 000 1.59 1.48 0.63 0.96 1.25 K59 + 000 1.67 1.16 0.57 0.97 1.16 K58 + 000 2.00 1.27 0.84 1.28 1.48 Right (down) K57 + 000 2.06 1.74 1.38 1.36 1.42 K58 + 000 1.79 1.40 0.68 1.03 1.14 K59 + 000 1.60 1.45 0.85 1.23 1.03 K60 + 000 1.42 1.21 0.62 0.89 1.14 K61 + 000 1.39 1.37 0.74 0.90 1.19 Detection lane Stake number Rutting depth (mm) 2008 2009 2011 2012 2013 Left (up) K62 + 000 5.0 6.0 4.0 9.0 12.0 K61 + 000 4.0 7.0 4.0 12.0 11.0 K60 + 000 5.0 7.0 3.0 13.0 11.0 K59 + 000 5.0 7.0 4.0 12.0 11.0 K58 + 000 6.0 6.0 3.0 10.0 11.0 Right (down) K57 + 000 7.0 5.0 3.0 12.0 15.0 K58 + 000 5.0 4.0 4.0 10.0 13.0 K59 + 000 4.0 5.0 3.0 8.0 14.0 K60 + 000 5.0 5.0 4.0 7.0 14.0 K61 + 000 5.0 5.0 4.0 11.0 13.0 Detection lane Stake number Friction coefficient 2008 2009 2011 2012 2013 Left (up) K62 + 000 69.2 72.0 50.0 62.5 48.6 K61 + 000 69.6 70.7 53.9 59.7 40.9 K60 + 000 67.0 65.8 55.5 57.3 44.1 K59 + 000 59.8 86.9 58.3 57.6 44.1 K58 + 000 54.6 67.1 53.7 56.6 47.4 Right (down) K57 + 000 65.6 33.4 74.4 63.6 42.9 K58 + 000 60.8 33.3 65.2 63.4 47.6 K59 + 000 61.5 35.6 73.4 61.7 49.4 K60 + 000 60.8 38.6 77.9 59.7 47.2 K61 + 000 58.9 34.9 79.7 59.3 42.1