Research Article

Numerical Simulation Study on Construction Effect of Top-Down Construction Method of Suspended Diaphragm Wall for Deep and Large Foundation Pit in Complex Stratum

Table 15

Summary of corresponding positions of maximum ground settlement during the 10th excavation under two working conditions.

Working conditionsDiaphragm wall (west)Diaphragm wall (east)
Maximum settlement (mm)Distance from foundation pit edge (m)Maximum settlement (mm)Distance from foundation pit edge (m)

Suspended foot diaphragm wall (working condition 1)−18.41915.00−17.77815.00
Suspended foot diaphragm wall (reinforcement) (working condition 2)−15.60020.00−15.91315.00