Numerical Simulation Study on Construction Effect of Top-Down Construction Method of Suspended Diaphragm Wall for Deep and Large Foundation Pit in Complex Stratum
Table 4
Summary of the corresponding depth of the maximum horizontal displacement of the suspended foot connected wall.
Working procedure
Suspended foot diaphragm wall (west, the length is 45.82 m)
Suspended foot diaphragm wall (east, the length is 51.98 m)