Research Article
Full-Scale Laboratory Test of Cutting Large-Diameter Piles Directly by Shield Cutterhead
Table 1
Pile foundations intruded into the tunnel.
| | Diameter (m) | Length (m) | Space (m) | Concrete grade | Length of the pile intruded into the tunnel (m) | Number of the pile intruded into the tunnel |
| | 1.2 | 12 | 2.8 | B40 | 7.84 | 2 | | 1 | 12 | 4.7 | B40 | 7.14 | 1 | | 1 | 13.5 | 1.1 | B40 | 1.7 | 6 |
|
|