Risk Assessment of EPB Shield Construction Based on the Nonlinear FAHP Method

Table 7

Membership value table of the risk factors.

Risk level risk factor

Level 1000000000000.10.20000.200
Level 200.20.30.20.2000.10.20.50.40.40.30.2000.50.30.3
Level 30.80.70.60.70.70.20.30.50.60.50.50.50.50.60.10.20.30.60.6
Level 40.20.10.10.10.10.60.60.40.200.1000.20.70.700.10.1
Level 5000000.20.100000000.20.1000