Research Article

Coal and Gas Comining in the High-Gas Detong Mine, China: Analytical and Numerical Parameter Optimization of Gas Extraction Boreholes

Table 4

Construction parameters of roof HLBs.

HoleDrilling depth/mDrilling diameter/mmThe horizontal distance between the final hole and roadway/mThe vertical distance between the final hole to the roof/m

17632033030
27822032530
38002032030