Research Article
Coal and Gas Comining in the High-Gas Detong Mine, China: Analytical and Numerical Parameter Optimization of Gas Extraction Boreholes
Table 4
Construction parameters of roof HLBs.
| Hole | Drilling depth/m | Drilling diameter/mm | The horizontal distance between the final hole and roadway/m | The vertical distance between the final hole to the roof/m |
| 1 | 763 | 203 | 30 | 30 | 2 | 782 | 203 | 25 | 30 | 3 | 800 | 203 | 20 | 30 |
|
|