Research Article

Research on the Effective Control of Ground Settlement during Double-Layered Foundation Pit Dewatering Based on Seepage Control-Recharge Coupling Model

Table 2

Settlement under two working conditions.

Monitoring pointsSettlement of monitoring points (mm)
Calculated valueMeasured value
Dewatering-seepage controlDewatering-seepage-control-recharge

A123.3013.93 
A227.1816.5816.64
A331.4119.4319.38
A435.7222.2821.43
A539.7124.78