Research Article
Study of the Instantaneous Water Level Measurement Method on Unsteady Flow Based on Single Camera and Fixed Scale Compensation in the Tunnel Model
Figure 5
A panoramic view of the instantaneous water surface in the Water Distribution Pool and the Southern Main Tunnel model (a) A panoramic view at 2.0 s before opening the gate. (b) A panoramic view at 1.0 s after opening the gate. (c) A panoramic view at 3.0 s after opening the gate. (d) A panoramic view at 204.0 s after opening the gate.
(a) |
(b) |
(c) |
(d) |