Research Article

Study of the Instantaneous Water Level Measurement Method on Unsteady Flow Based on Single Camera and Fixed Scale Compensation in the Tunnel Model

Figure 5

A panoramic view of the instantaneous water surface in the Water Distribution Pool and the Southern Main Tunnel model (a) A panoramic view at 2.0 s before opening the gate. (b) A panoramic view at 1.0 s after opening the gate. (c) A panoramic view at 3.0 s after opening the gate. (d) A panoramic view at 204.0 s after opening the gate.
(a)
(b)
(c)
(d)