Quality Risk Evaluation of Urban Rail Transit Construction Based on AHP–FCE Method
Table 1
Evaluation methods.
No.
Methods
Advantages
Disadvantages
1
Gray relational analysis
Easy to use, does not require a lot of sample data, and is suitable for filling gaps due to missing data
Subjective and difficult to determine the optimum value for some of the indicator data
2
TOPSIS
Objective and realistic reflection of reality and is intuitive and reliable
Specific data are needed for each evaluation indicator. Selection of quantitative indicators is difficult
3
Analytic hierarchy process (AHP)
Method is simple, and a small amount of quantitative data involved makes it a more systematic analysis method
Much subjective qualitative analysis and little objective quantitative data. Amount of data collation, statistics, and arithmetic makes solutions for decision-makers difficult
4
Fuzzy comprehensive evaluation (FCE)
Results of evaluation calculations are presented in vector form, which is rich in the information contained
Complex calculation process. Susceptible to subjective components in determining weights of vector indicators