Research Article
Analysis of Settlement of Group Pile Foundation in Linear Viscoelastic Soil
Figure 10
Interaction factor versus settlement for each group pile. (a) Two-group pile with L1 = 24 m and L2 = 20 m, (b) four-group pile with L1 = 24 m and L2 = 20 m, (c) nine-group pile with L2 = 20 m, and (d) nine-group pile with L1 = 24 m.
(a) |
(b) |
(c) |
(d) |