Research Article
Solutions on Establishing and Utilizing BIM for General Contractors in Key Scenarios of Digital Construction
Table 6
Performance of model extraction on requirement 1.
| Method | Time (min) | Size (MB) | Comment of usability |
| IFC text match | 0.5 | 1.2 | Most schedule information was missing | Database join | 8.1 | 15.6 | Was good enough for the worker’s disclosure | Proposed method | 15.0 | 13.9 | Was good enough for the worker’s disclosure |
|
|