Research Article
Influence of Base Rock Deterioration on Tunnel Bottom Structure Damage under Train Excitation
Table 8
V surrounding rock fatigue damage calculation results of bottom structure in three characteristic stages.
| State of surrounding rock | Structure part | Maximum damage value | Cumulative loading times (ten thousand times) | Fatigue lifetime (year) | Location of damage | Heavy-haul railway | Conventional railway | Heavy-haul railway | Conventional railway | Heavy-haul railway | Conventional railway | Heavy-haul railway | Conventional railway |
| Phase I: denser | Track bed | 1.315 | 1.123 | 1.13 × 104 | 1.33 × 104 | 76 | 89 | Below the track | Filling | 1.112 | 0.944 | 1.36 × 104 | 1.59 × 104 | 90 | 106 | Below the track | Inverted arch | 0.840 | 0.787 | 1.79 × 104 | 1.91 × 104 | 119 | 127 | Area below the line |
| Phase II: local cavity | Track bed | 1.493 | 1.250 | 1.01 × 104 | 1.20 × 104 | 67 | 80 | Below the track | Filling | 1.333 | 1.099 | 1.13 × 104 | 1.37 × 104 | 75 | 91 | Below the track | Inverted arch | 1.266 | 1.020 | 1.19 × 104 | 1.47 × 104 | 79 | 98 | The area below the line |
| Phase III: cavity connection | Track bed | 2.381 | 1.282 | 0.63 × 104 | 1.17 × 104 | 42 | 78 | Below the track | Filling | 1.724 | 1.136 | 0.87 × 104 | 1.32 × 104 | 58 | 88 | Below the track | Inverted arch | 1.961 | 1.111 | 0.77 × 104 | 1.35 × 104 | 51 | 90 | The area below the line |
|
|