Research Article

Quantifying Schedule Delay Risk in Construction Projects: A Data-Driven Approach with BIM and Probabilistic Reliability Analysis

Table 7

System indices in the case project.

Without systemWith system

Graphical presentation

Ego-levelDegree centrality15.676.05 (−61.4%)
Average distance22.53.82 (−83.0%)

Network-levelDensity10%11.82% (+18.2%)
Average degree8.112.57 (−68.3%)
Diameter2610 (−61.5%)
Effective size7.678.2 (+6.9%)