Research Article
On the Responses of Braced Diaphragm Wall Supporting Deep Excavation Subjected to Asymmetric Surcharge Loads
Table 2
Construction procedure for 2D analysis.
| Phase | Construction |
| 1 | Initial phase | 2 | Install the walls and surcharge loads | 3 | Excavate till the 1st excavation level (−2 m) | 4 | Install 1st strut (S1) at −1 m and excavate till the 2nd excavation level (−5 m) | 5 | Install 2nd strut (S2) at −4 m and excavate till the 3rd excavation level (−8 m) | 6 | Install 3rd strut (S3) at −7 m and excavate till the 4th excavation level (−11 m) | 7 | Install 4th strut (S4) at −10 m and excavate till the 5th excavation level (−14 m) | 8 | Install 5th strut (S5) at −13 m and excavate till the 5th excavation level (−16 m) |
|
|