Excavation stage no.Description

1Initial in situ stress analysis and self-weight load application
2Viaduct structure construction
3Displacement clearance
4Drilled occlusal pile construction
5Crown beam construction, inner support and lattice column construction, and the first stage of the foundation pit excavation to the elevation of −5 m
6The second stage of the foundation pit was excavated to an elevation of −8 m
7The third stage of the foundation pit was excavated to an elevation of −12.5 m
8The fourth stage of the foundation pit was excavated to an elevation of −17 m