Research Article
Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
Figure 14
Potential fracture surface for typical working conditions: (a) = 2.0 m (D was 3 m, 5 m, and 9 min sequence); (b) = 5.0 m (D was 3 m, 5 m, and 9 min sequence); (c) = 8.0 m (D was 3 m, 7 m, and 9 min sequence).
(a) |
(b) |
(c) |