FOS calculation results.

 = 2.0 m = 5.0 m = 82.0 m
Hs (m)FOSHs (m)FOSHs (m)FOS

0.11.050.10.1
0.21.450.20.2
0.51.800.51.050.51.01
1.02.061.01.311.01.01
1.52.101.51.421.51.13
2.02.032.01.482.01.23
2.51.952.51.532.51.28
3.01.903.01.503.01.31
6.01.636.01.456.01.33
12.01.3812.01.3112.01.24
18.01.2318.01.2018.01.18
24.01.1724.01.1524.01.12
30.01.1230.01.1030.01.09
36.01.0836.01.0636.01.06
42.01.0642.01.0342.01.04