Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
Table 2
FOS calculation results.
= 2.0 m
= 5.0 m
= 82.0 m
Hs
(m)
FOS
Hs
(m)
FOS
Hs
(m)
FOS
0.1
1.05
0.1
—
0.1
—
0.2
1.45
0.2
—
0.2
—
0.5
1.80
0.5
1.05
0.5
1.01
1.0
2.06
1.0
1.31
1.0
1.01
1.5
2.10
1.5
1.42
1.5
1.13
2.0
2.03
2.0
1.48
2.0
1.23
2.5
1.95
2.5
1.53
2.5
1.28
3.0
1.90
3.0
1.50
3.0
1.31
6.0
1.63
6.0
1.45
6.0
1.33
12.0
1.38
12.0
1.31
12.0
1.24
18.0
1.23
18.0
1.20
18.0
1.18
24.0
1.17
24.0
1.15
24.0
1.12
30.0
1.12
30.0
1.10
30.0
1.09
36.0
1.08
36.0
1.06
36.0
1.06
42.0
1.06
42.0
1.03
42.0
1.04