Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2023
/
Article
/
Tab 3
/
Research Article
Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
Table 3
Surrounding stratum critical overburden thickness.
(m)
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Hs
min
0.15
0.41
0.57
0.72
1.30
1.72
2.31
Hs
max
16.8
16.71
15.86
15.38
14.37
12.93
11.08