Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking

Table 4

FOS calculation results.

 = 2.0 m = 5.0 m = 8.0 m
D (m)FOSD (m)FOSD (m)FOS

1.01.151.01.051.0
2.01.322.01.082.0
3.01.463.01.193.01.01
4.01.584.01.304.01.11
5.01.685.01.405.01.20
6.01.786.01.456.01.27
7.01.837.01.487.01.29
8.01.888.01.508.01.30
9.01.889.01.509.01.30