Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking

Table 5

Surrounding stratum critical clear distance Dmin.

Hs (m)1.02.03.04.05.0 m6.07.08.0 m

(m)2.01.001.181.522.002.643.604.255.80
5.02.833.003.564.275.186.237.378.63
8.05.716.847.869.0910.2411.92