Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
Table 5
Surrounding stratum critical clear distance
D
min
.
Hs
(m)
1.0
2.0
3.0
4.0
5.0 m
6.0
7.0
8.0 m
(m)
2.0
1.00
1.18
1.52
2.00
2.64
3.60
4.25
5.80
5.0
2.83
3.00
3.56
4.27
5.18
6.23
7.37
8.63
8.0
—
—
5.71
6.84
7.86
9.09
10.24
11.92