Research Article

Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking

Table 6

FOS calculation results.

(m)D (m)1#-2#-3#2#-1#-3#1#-3#-2#

2.01.01.851.181.151.851.181.001.851.701.00
2.01.851.321.181.851.321.181.851.851.18
3.01.851.451.371.851.401.351.851.851.35
4.01.851.581.501.851.581.501.851.851.50
5.01.851.701.651.851.681.651.851.851.64
6.01.851.801.751.851.781.741.851.851.75
7.01.851.831.831.851.831.841.851.851.84
8.01.851.851.851.851.851.851.851.851.85
9.01.851.851.851.851.851.851.851.851.85

5.02.01.501.081.011.501.081.001.501.501.02
3.01.501.191.101.501.191.111.501.501.11
4.01.501.301.241.501.301.251.501.501.24
5.01.501.401.381.501.401.371.501.501.37
6.01.501.451.441.501.451.431.501.501.44
7.01.501.501.481.501.501.491.501.501.49
8.01.501.501.491.501.501.501.501.501.50
9.01.501.501.501.501.501.501.501.501.50

8.03.01.301.031.031.301.031.001.301.301.00
4.01.301.131.081.301.121.081.301.301.08
5.01.301.201.181.301.201.181.301.301.19
6.01.301.271.251.301.271.251.301.301.25
7.01.301.291.291.301.291.291.301.301.29
8.01.301.301.301.301.301.301.301.301.30
9.01.301.301.301.301.301.301.301.301.30