Research Article

Influence of Curing Time and Initial Moisture Content on Metakaolin-Based Geopolymer-Stabilized Soft Soil

Figure 11

SEM results for 5%, 10%, and 15% MK at 28 days curing time: (a) 5% MK at 28 days (×100), (b) 5% MK at 28 days (×10k), (c) 10% MK at 28 days (×100), (d) 10% MK at 28 days (×10k), (e) 15% MK at 28 days (×100), and (f) 15% MK at 28 days (×10k).
(a)
(b)
(c)
(d)
(e)
(f)