Nos | Mitigation measures of time overrun | Mitigation measures of cost overrun |
|
1 | Complete and proper design at the right time | Accurate estimation of the initial cost of the project |
2 | Accurate estimation of the initial cost of the project | Complete and proper design at the right time |
3 | Decision makers should have technical awareness about water supply projects | Decision makers should have technical awareness about water supply projects |
4 | Obtaining permissions from concerned organizations before starting to work | Contractors must consider their financial capabilities before bidding and should employ a qualified staff for the financial management of projects |
5 | The owner should select a reliable contractor and experienced in water supply projects | The owner should select a reliable contractor and experienced in water supply projects |
6 | The project site ownership before doing tender by the owner | Reduce change orders during construction |
7 | Reduce change orders during construction | Effective strategic planning |
8 | Effective strategic planning | The initial time of the contract should be determined based on the geographical location of the project |
9 | The initial time of the contract should be determined based on the geographical location of the project | Planning completely and accurately the project by the consultant engineers |
10 | Planning completely and accurately the project by the consultant engineers | Frequent progress meeting |
11 | Frequent progress meeting | Ensure timely delivery of materials |
12 | Ensure timely delivery of materials | Proper site management and supervision |
13 | Proper site management and supervision | |
14 | Proper emphasis on past experience | |
15 | Absence of bureaucracy | |
|