Research Article

Hazards and Treatment of Collapsible Loess Foundation on Ultrahigh Voltage Transmission Lines

Figure 13

Scheme 1: (a)–(c) Horizontal displacement (UX), vertical displacement (UY), and saturation (sr) after 30 hr of rainfall infiltration; (d)–(f) the horizontal displacement (UX), vertical displacement (UY), and saturation (sr) after rainfall infiltration ceases.
(a)
(b)
(c)
(d)
(e)
(f)