Research Article
Hazards and Treatment of Collapsible Loess Foundation on Ultrahigh Voltage Transmission Lines
Figure 13
Scheme 1: (a)–(c) Horizontal displacement (UX), vertical displacement (UY), and saturation (sr) after 30 hr of rainfall infiltration; (d)–(f) the horizontal displacement (UX), vertical displacement (UY), and saturation (sr) after rainfall infiltration ceases.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |