Research Article

Hazards and Treatment of Collapsible Loess Foundation on Ultrahigh Voltage Transmission Lines

Figure 14

Scheme 2: (a)–(c) horizontal displacement, vertical displacement, and saturation after 30 hr of rainfall infiltration; (d)–(f) the horizontal displacement, vertical displacement, and saturation after rainfall infiltration ceases.
(a)
(b)
(c)
(d)
(e)
(f)