Statistical table of simulation results.
| Calculation scheme | Rainfall stage | Deformation at the top of the foundation | Deformation at the bottom of the foundation | Inclination rate of the foundation | Left | Right | Left | Right | Settlement at the midpoint (cm) | Vertical (cm) | Horizontal (cm) | Vertical (cm) | Horizontal (cm) | Vertical (cm) | Horizontal (cm) | Vertical (cm) | Horizontal (cm) |
| 1 | Rainfall (30 hr) | 3 | 6 | 2 | 4.5 | 0.5 | 0.25 | 0.5 | 0.25 | 0.5 | 0 | End of rainfall (48 hr) | 4 | 6 | 3 | 5 | 0.8 | 0.5 | 0.6 | 0.5 | 0.7 | 0.0003 |
| 2 | Rainfall (30 hr) | 4 | 1.4 | 5 | 0.8 | 0.8 | 0.1 | 0.8 | 0.1 | 0.8 | 0 | End of rainfall (48 hr) | 12 | 8 | 10 | 4 | 2 | 0.3 | 2 | 0.3 | 2 | 0 |
| 3 | Rainfall (30 hr) | 3.4 | 0.2 | 2 | 0.8 | 0.3 | 0.1 | 0.3 | 0.1 | 0.3 | 0 | End of rainfall (48 hr) | 5 | 2 | 4.2 | 3 | 0.6 | 0.5 | 0.6 | 0.5 | 0.6 | 0 |
| 4 | Rainfall (30 hr) | 10 | 0.2 | 11 | 1 | 9 | 1 | 8 | 1.2 | 8.5 | 0.0015 | End of rainfall (48 hr) | 24 | 5 | 24 | 2.5 | 20 | 2 | 18 | 0.3 | 19 | 0.003 |
|
|