Change proportion of the typical section of the downline.

Typical section segment ring of the downlineContent of monitoringDisturbance caused by excavation of foundation pit/mmDisturbance caused by new tunnel tunneling/mmProportion of change

X510Vertical displacement−0.60.6−200.0%
Horizontal displacement0.9−0.2−122.2%
Segment convergence0.90.0−100.0%
Differential settlement of ballast bed0.00.2/

X518Vertical displacement−0.9−0.90
Horizontal displacement0.9−0.8−188.9%
Segment convergence1.10.7−36.4%
Differential settlement of ballast bed−0.3−0.2−33.3%

X523Vertical displacement−0.80.2−125.0%
Horizontal displacement1.0−1.2−220.0%
Segment convergence1.00.1−90.0%
Differential settlement of ballast bed−0.5−0.740.0%