Review Article
Multiple Disturbances of Existing Tunnels Caused by Deep Excavation and New Shield Tunnel
Table 4
Change proportion of the typical section of the downline.
| Typical section segment ring of the downline | Content of monitoring | Disturbance caused by excavation of foundation pit/mm | Disturbance caused by new tunnel tunneling/mm | Proportion of change |
| X510 | Vertical displacement | −0.6 | 0.6 | −200.0% | Horizontal displacement | 0.9 | −0.2 | −122.2% | Segment convergence | 0.9 | 0.0 | −100.0% | Differential settlement of ballast bed | 0.0 | 0.2 | / |
| X518 | Vertical displacement | −0.9 | −0.9 | 0 | Horizontal displacement | 0.9 | −0.8 | −188.9% | Segment convergence | 1.1 | 0.7 | −36.4% | Differential settlement of ballast bed | −0.3 | −0.2 | −33.3% |
| X523 | Vertical displacement | −0.8 | 0.2 | −125.0% | Horizontal displacement | 1.0 | −1.2 | −220.0% | Segment convergence | 1.0 | 0.1 | −90.0% | Differential settlement of ballast bed | −0.5 | −0.7 | 40.0% |
|
|