Second-level risk indicator | Third-level risk indicator |
|
Risk of construction personnel factor B1 | Risk of low-technical level c11 [21ā23] |
Risk of weak safety awareness c12 [24] |
Risk of practitioner qualification c13 [22] |
Risk of construction personnel slowdown c14 [25, 26] |
|
Risk of construction technology factor B2 | Risk of improper drawing design c21 [27, 28] |
Risk of engineering technology c22 [29] |
Risk of construction machines, tools, and equipment c23 [30] |
Risk of cross-construction c24 [31, 32] |
Risk of construction accidents c25 [33] |
|
Risk of construction management factor B3 | Risk of poor safety management c31 [28] |
Risk of defective construction party coordination c32 [34] |
Risk of poor design rationality of construction organization c33 [32] |
Risk of inadequate plan adjustment and engineering change c34 [35] |
Risk of deficient contract management and execution c35 [36] |
Risk of confusing organization setup c36 [37] |
Risk of poor management authority c37 [38] |
|
Risk of construction period factor B4 | Risk of document life cycle c41 [39] |
Risk of construction period c42 [28] |
Risk of construction period delay c43 |
|
Other risks B5 | Risk of policies and laws c51 [32] |
Economic risk c52 [40] |
Social risk c53 [36, 41] |
Risk of natural disasters c54 [42, 43] |
|