Research Article

Study on Control of Cumulative Risk for Submarine Tunnel Shield Construction

Figure 13

The simulation result of risk conduction network. (a) The simulation results of risk-preparation. (b) The simulation results of risk-launch. (c) The simulation results of risk-normal. (d) The simulation results of risk-receiving.
(a)
(b)
(c)
(d)