Research Article
Study on Control of Cumulative Risk for Submarine Tunnel Shield Construction
Figure 13
The simulation result of risk conduction network. (a) The simulation results of risk-preparation. (b) The simulation results of risk-launch. (c) The simulation results of risk-normal. (d) The simulation results of risk-receiving.
(a) |
(b) |
(c) |
(d) |