RX | Ri |
|
RS | Policy (R1) |
Public opposition (R2) |
Force majeure (R3) |
Contract (R4) |
Construction term (R5) |
|
RP | Instability at the launching hole (R6) |
Damage to auxiliary facilities (R7) |
Equipment damage and object strike (R8) |
Shield machine assembly error (R9) |
|
RL | Insufficient reinforcement at the receiving hole (R10) |
Launching port seal failure (R11) |
Off axis at shield launching (R12) |
Unstable reaction frame (R13) |
Unqualified base at the launching hole (R14) |
|
RN | Undiscovered karst caves and obstacles (R15) |
Improper control of shield tunnelling line (R16) |
Unsteady working face and water gushing (R17) |
Jack failure (R18) |
Shield posture out of control (R19) |
Shield tail seal failure (R20) |
Pressure loss of slurry sump (R21) |
Operation with pressure in warehouse (R22) |
Unqualified mud (R23) |
Improper grouting technology and parameters (R24) |
Unqualified tunnel segment (R25) |
Improper segment assembly (R26) |
Settlement of adjacent structures (R27) |
|
RR | Off axis at shield receiving (R28) |
Insufficient reinforcement at the receiving hole (R29) |
Receiving port seal failure (R30) |
Unqualified base at the receiving hole (R31) |
Instability at the shield receiving hole (R32) |
Shield machine disassembly error (R33) |
|