Measurement and Analysis of Deformation of Underlying Tunnel Induced by Foundation Pit Excavation
Table 2
Deformation monitoring results for the lower recumbent tunnel.
| Maximum uplift | November 27, 2018 | The bottom plate was completed on January 11, 2019 | Top plate completed on April 21, 2019 | 100 days after completion of the base plate | Control value (mm) | Accumulated displacement (mm) | Accumulated displacement (mm) | Accumulated displacement (mm) | Deformation value (mm) | Deformation rate (mm/day) |
| Upward tunnel | 5.09 | 4.46 | 3.71 | −0.75 | −0.008 | 7 | Downward tunnel | 5.13 | 4.46 | 3.85 | −0.61 | −0.006 | 7 |
|
|