Research Article

Using the Information Quantity Method to Assess the Regional Risk of Highway Slope to Improve the Level of Risk Management

Table 2

The risk assessment factor table of artificially excavated slopes on the national and provincial highways in Quzhou City.

Evaluation factorsFactor classificationClassification codingNumber of grid cellsThe amount of informationCorrected amount of informationSorting
NiNSiS

Geometric factorsSlope excavation height F9Soil slope ≤6 m; rock slope ≤8 m131194258833−0.66179689729
Soil slope 6–10 m; rock slope 8–15 m280298258833−0.14299279522
Soil slope 10–20 m; rock slope 15–30 m31242862588330.33636381214
Soil slope 20–40 m; rock slope 30–60 m421552588330.20926331018
Soil slope >40 m; rock slope >60 m500258833
The slope excavation angle F10Soil slope ≤32°; rock slope ≤42°1660258833−1.13051103632
Soil slope 32–37°; rock slope 42–49°2431182588330.16258954819
Soil slope 37–42°; rock slope 49–58°3691612588330.32477619715
Soil slope 42–48°; rock slope 58–67°436152258833−0.26828752526
Soil slope >48°; rock slope >67°5102342258833−0.03776386721

Internal factorsSlope deformation history and the present situation F11No1100657258833−0.71043977531
Slight21091282588331.0113916765
Medium347482588331.1510206484
Serious4229258833−1.5020745921.5020745921
The compactness of soil slope F12Dense106258833
Medium dense209258833
Little dense3112588331.1720740572
Loose401258833
Soil slope moisture state F13Hard1117258833−1.66113928733
Hard plastic200258833
Plastic300258833
Soft plastic400258833
Rock hardness degree of rock slope F14Hard rock1531258833−0.65247523528
Relatively hard rock200258833
Relatively soft rock31276258833−0.67375263330
Soft rock4148584258833−0.20061465224
Extremely soft rock5901252588330.8435699908
Development degree of structure surface of rock slope F15Good1129605258833−0.37334199627
General2931432588330.7418289209
Relatively poor331632588330.46292653512
Poor4252588330.25578332516
Extremely poor500258833

External factorsSurface drainage F16Facilities are complete1125480258833−0.17339830923
Facilities are relatively complete217141258833−0.9434724890.9434724896
Facilities are not complete338842588330.37884341813
Lack of facilities4761282588330.65077713411
Underground drainage F17Facilities are complete11293762588330.10229731820
Facilities are relatively complete224192258833−0.9073674840.9073674847
Facilities are not complete31032652588330.22707321917
Lack of facilities400258833
Degree of slope protection engineering diseases F18Good1181716258833−0.20310907825
General2711132588330.70736611610
Relatively poor3442588331.1720740572
Poor400258833
Extremely poor500258833