|
Exchange models (according to use case) | Names of exchange model | Exchange requirements (ERs) |
|
EM_01: Architecture and engineering: off-site construction company | EM_01: Conceptual evaluation model | Volumetric model of the project, contains the general characteristics in terms of architecture and geometry based on volumes of the proposed constructive solutions, with the allocation of estimated costs |
EM_02: MEP architecture and design: engineering | EM:02: MEP architecture and design model | Coordination model, contains the details of the architectural and installation definitions approved by the project client |
EM_03: Engineering, architecture and MEP: off-site construction company | EM_03: Final project model | Detailed final model with architectural and installation definitions, with the incorporation of structural definitions |
EM_04: Engineering: off-site construction company | EM_04: Fabrication model | Project model used to generate the information associated with panel fabrication, multiwall configuration, and parameters associated with the fabrication process. This model verifies the information associated with the nailing and cuts to be made during manufacturing, as well as the details and special procedures to be considered during panel assembly |
EM_05: Off-site construction company: general contractor | EM_05: Assembly model | Construction model of the project that incorporates the information associated with the assembly process, i.e., the placement of connection hardware, screws, construction sequences, details of connections, etc |
|