Research Article

IDM for the Conceptual Evaluation Process of Industrialized Timber Projects

Table 3

Information exchange.

Information exchangesUse caseDescriptions

F_01: Project documentationClient: architectureThe main background of the project, such as type of building, location, and initial planimetry
F_02: Optimization informationOff-site construction company: architectureInformation that the off-site construction company provides to the designers in the early stages to achieve a more accurate evaluation of the project. This information can consider the quantification of the project’s panels, the configuration of the assembly tables, and all the appraisals that the off-site construction company visualizes as a specialist according to the project’s background