Large-Scale Construction Waste Mountain-Mounding Technology Based on the Project in Meibei Lake Scenic Area

Figure 13

Slip resistance stability calculation results. (a) After construction (sliding to the left). (b) After construction (sliding to the right). (c) Twelve months after the end of construction (sliding to the left). (d) Twelve months after the end of construction (sliding to the right). (e) Twenty-four months after the end of construction (sliding to the left). (f) Twenty-four months after the end of construction (sliding to the right).