Large-Scale Construction Waste Mountain-Mounding Technology Based on the Project in Meibei Lake Scenic Area
Figure 14
Slip resistance stability calculation results. (a) Normal working condition of profile 3-3: Bishop method of anti-slip stability calculation slip arc position (normal sliding to the left). (b) Normal working condition of profile 3-3: Bishop method slip stability calculation slip arc position (normal sliding to the right). (c) Normal working condition of profile 3-3: Swedish method of anti-slip stability calculation slip arc position (normal sliding to the left). (d) Normal working condition of profile 3-3: Swedish method of anti-slip stability calculation slip arc position (normal sliding to the right). (e) Seismic condition of profile 3-3: Bishop method slip stability calculation slip arc position (normal sliding to the left). (f) Seismic condition of profile 3-3: Bishop method slip stability calculation slip arc position (normal sliding to the right). (g) Seismic condition of profile 3-3: Swedish method of anti-slip stability calculation slip arc position (normal sliding to the left). (h) Seismic condition of profile 3-3: Swedish method of anti-slip stability calculation slip arc position (normal sliding to the right).
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
| (g) |
| (h) |