Large-Scale Construction Waste Mountain-Mounding Technology Based on the Project in Meibei Lake Scenic Area

Table 11

Summary of the maximum value of the horizontal displacement calculation.

Work conditionsHorizontal displacement (m)

Construction period 12 months0.420
Construction period 18 months0.402
Construction period 24 months0.391