Large-Scale Construction Waste Mountain-Mounding Technology Based on the Project in Meibei Lake Scenic Area
Table 12
Summary of slip stability coefficients for Profile 3-3.
| | Profile 3-3 | Calculated working conditions | End of construction | End of 12 months | End of 24 months |
| Filling period 12 months slip resistance stability factor | Sliding to the left | 3.13346 | 3.13532 | 3.13539 | | Sliding to the right | 2.18455 | 2.24773 | 2.24786 | | Left + earthquake | 2.28345 | 2.28486 | 2.28492 | | Right + earthquake | 1.72585 | 1.79245 | 1.79256 |
| Filling period 18 months slip resistance stability factor | Sliding to the left | 3.13415 | 3.13535 | 3.13539 | | Sliding to the right | 2.26386 | 2.26834 | 2.26845 | | Left + earthquake | 2.28397 | 2.28489 | 2.28492 | | Right + earthquake | 1.80197 | 1.80216 | 1.80225 |
| Filling period 24 months slip resistance stability factor | Sliding to the left | 3.13451 | 3.13537 | 3.13539 | | Sliding to the right | 2.31738 | 2.32357 | 2.32366 | | Left + earthquake | 2.28425 | 2.2849 | 2.28492 | | Right + earthquake | 1.83627 | 1.84516 | 1.84523 |
|
|