| Group | Risk factor | References |
|
| Design risk | Defective design | [24] |
| Design change due to change orders | [21] |
| Delay in drawing approval | [25] |
|
| Health, safety and environment | Force majeure (earthquake, pandemics, etc.) | [19] |
| Night work (poor visibility, slip, and trip) | [26] |
| Exposed existing pipelines during construction | [22, 27] |
| Inadequate site safety procedures |
| Government permit approval delay |
| Accidents (human, vehicle, etc.) |
| Geological factors like soil movement and landslides |
|
| Security & Social | Terrorism and sabotage | [22, 27] |
| Reduction in the productive capacity of labor and machinery | [19] |
| Labor strike | [17] |
|
| Supply risk | Supplying invalid materials | [19] |
| Materials monopoly by suppliers | [19] |
| Delays in materials and equipment supply | [21] |
|
| Financial risk | Financial failure/bankruptcy | [19] |
| Inflation and interest rate increase | [25] |
| Increase in tax regulation | [25] |
| Increase of contractor project cost (Cost overruns) | [25] |
|
| Construction risk | The discrepancy between implementation requirements and specifications | [19] |
| Variation orders | [17] |
| Poor pipeline material quality | [18, 28] |
| Corrosion of pipeline during its life cycle time | [22, 27] |
| Weakness in identifying and monitoring dangers. |
| Operational errors (human error and equipment failure) |
| Unforeseen site circumstances (differing site conditions) | [24, 25] |
|