Research Article
Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
Table 4
Construct validity of the six groups.
| | Cronbach’s α | Composite reliability | Average variance extracted (AVE) |
| | Construction | 0.786 | 0.855 | 0.542 | | Design | 0.626 | 0.843 | 0.728 | | Financial | 0.765 | 0.851 | 0.588 | | Health–safety–environment | 0.674 | 0.802 | 0.504 | | Security–social | 0.198 | 0.678 | 0.541 | | Supply | 0.632 | 0.845 | 0.731 |
|
|