Research Article
Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
Figure 17
Inhaul cable tension after group removal: (a) Group 1; (b) Group 2; (c) Group 3; (d) Group 4; (e) Group 5; (f) Group 6.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |