Research Article

Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures

Table 7

Measured deformation values of monitoring points.

Construction phaseMonitoring values/vertical displacement (mm) (negative values indicate downward movement)
12345678

Lowering stagesFirst stage−33−31−52−50−30−27812
Second stage−41−43−60−75−48−651215
Third stage−55−57−76−103−68−751920
Rebound stage−31−35−46−53−45−401211
Rebound value (maximum downward value − maximum rebound value)24223050233579