Research Article
Modeling Cost-Estimation Factors for Public Building Projects with Hybrid Approach in Addis Ababa
Table 8
Rotated loadings time-/cost-related factors.
| ID | Rotated loadings | PCTCF1 | PCTCF2 |
| TCR1 | 0.797 | −0.057 | TCR2 | 0.736 | 0.130 | TCR3 | 0.704 | −0.006 | TCR4 | 0.640 | −0.106 | TCR5 | 0.795 | −0.026 | TCR6 | 0.468 | −0.544 | TCR7 | 0.015 | −0.839 | TCR8 | −0.131 | −0.824 |
|
|