Research Article
Numerical and Preliminary In Situ Investigation on Roadway Excavation Using Static Expansion Mechanical Fracturing
Figure 15
Mechanical excavation with piston splitter. (a) and (c) Cut hole and fracturing hole constructions at 770 m level and 926 m level; (b) and (d) static expansion mechanical fracturing results at 770 m level and 926 m level.
(a) |
(b) |
(c) |
(d) |